TERRACED ENTRANCE COVERED WITH STONE

TERRACED ENTRANCE COVERED WITH STONE

3800

Completed works

  • Measurement and design
  • Production
  • Construction works
  • Location: Kaunas, Lithuania
  • Gabro Bukinskie Black (flamed – termo)